October 9, 2012

  • Faking It

    Sometimes I have no idea what I am doing at my job, but I have to pretend I fully understand.

    Customer's Email:

      For autotest, we will probably start out with dual sup2T, and 2 Ringar, and then change the Ringar at a later date to use the proposed loopback card. We still have to finalize the development strategy and timeframe when the new card will be ready. Ringar can only test half the serial channels per slot while the loopback card would test all 4 channel. 
     
      The final config will be dual sup2T, loopback cards in 4 slot, and then a legacy card in one slot to cover the Ganymede bus. The Cetus design is changing though — they may reduce the backplane layer count and not support legacy cards. If they go this route then we will use loopback cards in all slots

    My Email:

    Noted.  Thank you for the update.

     

    For me, its like reading out of a textbook again.  School was not so useless after all.  

    Fake it until you make it. 

Comments (15)

Comments are closed.

Post a Comment